UPON COMPLETION OF WORK
Figure 27
Upon completion of work, and prior to any maintenance procedure, please proceed as follows:
2
1
1.
Lift the squeegee with the lever (fig.4)
2.
After a few seconds, press the tap button (2) to switch off the suction motor and to dry the
squeegee hose.
3.
Press the main switch (1).
4.
Lower the front wheel (fig.3)
5.
Take the machine where you intend to drain the water out.
Figure 28
6.
Take the machine where you intend to drain the water out
7.
Release the brush and clean it with a jet of water (for brush release, see the following
section “BRUSH RELEASE”)
ATTENTION: To carry out this procedure please wear protection gloves to avoid
contact with harmful solutions.
15