11
PREPARATION OF MACHINE
1. HANDLING THE PACKED MACHINE
The machine is contained in specific packaging with a pallet for the handling with fork trucks. The
packages CANNOT be placed on top of each other.
The total weight of the machine and packaging is 680kg.
The packaging dimensions are as follows:
SMG120 B
A: 1620mm
B: 1520 mm
C: 2380 mm
A
C
B
1.
Remove the outer packaging
2.
The machine is fixed to the pallet with wedges which block the wheels
3.
Remove the wedges
4.
Use a chute to get the machine down from the pallet, pushing it backwards. Do not assemble the rear
squeegee before unloading the machine, and avoid violently jolting the brush head. To assemble the
squeegee, read the section “ASSEMBLING THE SQUEEGEE”.
5.
Keep the pallet for any future transport needs
ATTENTION: If the product is delivered in cardboard containers, handle the
packed product with suitable lifting means that comply with the legal
requirements.
ATTENTION: During this operation, check there are no people or objects near
the machine.
2. HOW TO MOVE THE MACHINE
1.
Make sure the solution tank and the recovery tank are empty
2.
Check that the detergent canister is empty
3.
Check that the brush head and squeegee are in the raised position
4.
Place it on a pallet using a chute
5.
Check that the key switch is in the “0” position and remove the key
6.
Engage the parking brake
7.
Secure the machine to the pallet using wooden wedges
3. INSTRUMENT PANEL COMPONENTS
The instrument panel components are identified as follows:
1.
3-way knob to set working speed
2.
Main key switch
1
2