Page 4
Step 3
Assembly Procedure (ATV-25-700-QR)
After your boom mounting brackets are secured in
place and the unit secured on your ATV, bolt the
7-nozzle boom in place with (2) Square U-Bolts and
whiz nuts.
A 1/2” socket or wrench is required for this step.
This boom can be positioned as shown or in a few
alternate positions.
Try to maintain approximately 18-22 inches above the
items being sprayed, for optimal coverage. This is con-
sidered where the nozzles will mount, at the end of
these brackets.
With the boom secured to the boom mounting brack-
ets, the nozzle harness can now be attached.
Attach the nozzle harness to the boom. Using the
nozzle clamps, attach the nozzle harness to the boom
as shown in DETAIL Clamp.
Step 4
DETAIL Clamp