MAINTENANCE
ET 65-75
Rev. 000
20/12/04
30/34
5.4 ELECTRIC EQUIPMENT CONTROL
It is very important to check the electric system up every two years. Disconnected cables or burnt cables
must be immediately replaced.
Interventions on the electric system must be carried out by a trained technician.
Every kind of intervention not explained in the operator manual must be carried out by
FIORENTINIs technicians.
Tests to be carried out
HOW OFTEN
OPERATOR
INSPECTION
Safety devices
Every 2 years
Trained technician
Electric system
Every 2 years
FIORENTINI technician
Braking system
Every 3 months
Trained technician
Complete check up
Every 5 years
FIORENTINI technician
MAINTENANCE
Recovery tank cleaning
Every day
Operator
Clean water tank
Every month
Operator
Suction motor filter
Every day
Operator
Suction pipes cleaning
Every week
Operator
Squeegee cleaning
Every week
Operator
Squeegee blades
Every week
Operator
Battery water level
Every week
Operator
Battery cables fixing
Every 6 months
Trained technician
Brushes in each motor
Every year
Trained technician