!
"#$%&!#&$'!()!*+&!,(-$'!+..%(+)/$&0!+)'!12$!.-3'#/1&!3,!/345#&1(3)!3,!&#/2!,#$%&0!/3)1+()!
/2$4(/+%&!6)37!13!12$!81+1$!3,!9+%(,3-)(+!13!/+#&$!/+)/$-0!5(-12!'$,$/1&!+)':3-!312$-!-$.-3'#/1(;$!
2+-4<!=2(&!7+-)()*!(&!(&&#$'!.#-&#+)1!13!9+%(,3-)(+!>$+%12!?!8+,$1@!93'$!8$/<ABACD<E
!
REV. 10-24-12 Page 2
Specifications
3
Preparation for Non-Conbustible Structure
4
Hard Piping to Fire Pit
4
Cross Ventilation Requirements
4
High Elevation
4
Installation into an Approved Enclosure
5
Requirements
5
Installing Key Valve & Piezo Ignitor
5
Typical Installation Drawings
6
Installing Battery in Piezo Ignitor
7
Ignitor Alignment
7
Installation of Lava Rock/Media
7
Operation
8
Lighting Instructions
8
Air Shutter Adjustment
8
Replacement Parts
9
Replacement Parts List
10
Fire Pit Maintenance/ Trouble Shooting
11
Optional Accessories/Conversion Kits
11-12
Warranty
13
TABLE OF CONTENTS
NOTE:
This installation instruction covers both Match Throw and Manual Spark
Igntition systems. Not all sections will be applicable to your particular application.
Matchlight Fire Pits