INSTALLATION OF THE FIRE RING SYSTEM IN THE PIT ENCLOSURE
Gas lines and fittings must be installed in to the non-combustible structure. All gas connections must be leak tested before installa-
•
tion of the fire ring system. Soapy water, leak detection is required before regular use of the fire pit.
Do not use material that will absorb moisture over time and will not release this moisture quickly. Moisture can boil in this material
•
and can rapidly break apart and cause damage or personal injury.
Any other combustible material should never be on top on the side of the fire pit. This could cause unsafe operation of this system,
•
and damage to the component that will not be covered under our warranty.
Cover the complete burner with lava or decorative Rock material. Completely cover the star burner, no more than 1 inch above the
•
star.
Using the remote control to initiate the start up of the FPB system.
•
NOTE
: This may take several cycles of ON/OFF to purge the airflow from the gas lines.
This direct spark system will turn off after 15 seconds if the burner will not light.
START UP
If using 120V power, you must use a switch or a breaker that can be turned on and off easily. Normal operations with this FPB
1.
system are with battery power, and nothing else would have to be done.
With the remote, turn ON the ignition to the fire pit. Flames will come on.
2.
There are two levels of flame height, they can be adjusted with our standard solenoid.
3.
High
80,000
BTUH
110,000
BTUH
Low
50,000
BTUH
50,000
BTUH
REV 9/8/09 Page 6
WARNING
If you are installing a (LP) Propane “FPB” you will have to order either;
FPB 19 AFEI LP KIT
FPB 25 AFEI LP KIT
To be able to convert your natural gas system to (LP) Propane.
ON
OF
F
Requires 4-AA 1.5V
alkaline batteries
Control Box
Batt
ery c
over
slide
s on
/off
Slide
Switch
ON
OFF
Change Batteries
INSTALLATION - BATTERY BOX
During the installation of “FPB” the location of the Battery Box should be installed in the location that is easy to service. The very
•
best location is in the vertical wall of the Fire Pit. The plastic junction box is provided for the installation of the battery box.
The wiring from the valve box is the (12) twelve feet long with 3 wires. Special 4 pin connector and (2) two wire with 1/4’’ female
•
connectors.
Feed all wires into the plastic junction box and connect special 4 wire plug into back of the battery box. Connect 1/4’’ connectors to
•
the matching color, red to red and black to black. Fig 6
Install the (4) AA batteries in to the battery compartment shown in figure 7. Then snap cover plate in place as shown in figure 8.
•
Remote Receiver
Cover Plate
(Rear View)
FIG. 8
FIG. 6
Reinstall the battery box into the plastic junction box, line up the two holes in the cover and install white screws provided.
•
Battery can be changed or installed by removing the two screws that hold the battery box in place. Remove assembly, slide cover
•
away from the cover plate and install the (4) four AA batteries. Fig.7
Be sure the batteries are installed positive to positive and negative to negative. If one battery is installed wrong the system will not
•
operate.
Once the FPB is installed into your fire pit enclosure, the burner and control system should be tested before the media is installed.
•
Installation of battery in handheld transmitter.
•
You have one handheld transmitter, RCAF-3 and you have to install (1) one 23A battery with the transmitter.
•
On the back side of the handheld, push the cover away from the case. Place the battery within the handheld. Match the positive to
•
positive to negative to negative.
You can tell if the battery is correctly by the red LED light at the top of the handheld above the buttons (Fig 9). The LED light will
•
only be lit when a button is pushed.
FIG. 7