26
NFOD42 Gas Fireplace
INSTALLATION
1)
Place top/bottom (A) on the ground - fl at side down. Bend
the tabs up to a 90
°
angle.
2)
Position 4 of the (B) pieces with the fl at side of (B)
contacting the tab as shown below.
3)
Line up the screw holes of (A) with (B). Secure
each (B) with 2 wafer screws (one on each side) as shown
below.
4)
With all 4 - (B) pieces secured to the bottom with 2 screws
(1 on each side) (A) can be placed into position, as shown
below. Ensure all tabs on the (A) are bent to 90
°
and oriented
to each (B) as shown in step 2.
5)
Line up top (A) screw holes with (B) screw holes and secure
with (B) to (A) with 2 wafer screws (1 on each side - 8 in total).
Note:
Securing inner (B) pieces to top (A) will add rigidity,
making it easier to lineup and install outer (B) pieces.
Important:
(B) - (tall vertical supports) must be positioned as
shown to ensure the correct installation of (C).
Bend tabs inward to
90
°
angle.
Part B positioned fl at side fl ush with A tab.
(A)
(A)
(B)
(B)
(A)
Tab locations
(A)