background image

 

Local Application Fire System 

FP-08917 

Rev 3.1

 

 

Page  |  6 

7

 

Installation of FirePro Generators 

7.1

 

FirePro Condensed Aerosol Fire Extinguishing System Arrangement. 

 

FirePro units and system components installed to allow inspection and maintenance. 

 

Locate  FirePro  units  where  they  are  not  exposed  to  mechanical  damage,  exposed  to 
chemicals, or weather conditions, that may render them inoperative.  Protective provisions 
shall be adopted, if necessary. 

 

Firepro  units  shall  be  securely  installed.  Use  heavy  duty  brackets  where  necessary.  
Brackets should be capable of handling the risk evironment, including vibration. 

7.2

 

Firepro units must be installed at NOT less than the minimum safe distances as specified in the 
design calcuations. 

7.3

 

Means for prompt rescue of any trapped personnel shall be provided, including: 

 

Adequate aisle ways/routes of exit. 

 

Alarms 

 audible and visual, that operate immediately on detection of the fire. 

 

Signs in accordance with relevent standards for the installation. 

7.4

 

System  components  shall  be  positioned  to  the  minimum  clearances  from  energized  electrical 
parts as per:AS 4487 and AS 3000. 

7.5

 

Handling and Storage - when handling theCondensed Aerosol Generators do not: 

 

Disassemble the unit  

 

Carry out any welding work in the vicinity of 
the fire extinguishing system components. 

 

Exert  force  or  impact  which  creates 
physical  or  mechanical  damage  to  the 
casing. 

STORAGE and OPERATIONAL CONDITIONS 

 

Temperature: 

54 and +54°C 

 

Humidity: maximum 98% RH 

 

Service life: 15 years (date of manufacture appears on each generator) 

7.6

 

Positioning 

 

 

 

CORRECT 

FP Units directing the aerosol stream away from opening 

 

INCORRECT 

FP units are directing the stream towards the opening. 

 

 

Summary of Contents for FP-08917

Page 1: ...ge 1 CONTENTS 1 General Operations 2 2 Components 3 3 Specifications 3 4 Installation 4 5 Servicing Maintenance 5 6 Operation Activation 5 7 Installation of FirePro Generators 6 8 Connection of Multip...

Page 2: ...he switch 1 3 Power Supply designed to operate on 6 to 30vDC supply Number of FirePro units will depend on incoming power supply 1 4 A thermal Fuse FP 08825 may be connected to give a signal that syst...

Page 3: ...ch Plug for easy install FP 6100 Heavy Duty Bracket 316 SS Suits FP 1200 2000 3000 5700 FirePro Aerosol Generators Detection Circuit FP 9510 Linear Heat Detection Cable 182 C Supplied in Cut Lengths w...

Page 4: ...4 5 Manual Actuator s where installed placement is to be carefully considered ensure that it is easily accessible in case of emergency Follow instructios for the installation of the FP 14053 switch 4...

Page 5: ...connected Note the FirePro Simulator stay illuminated until the reset button on the simulator is pressed 5 4 Reconnect the FirePro activation circuit System Logbook A logbook must be kept recording a...

Page 6: ...prompt rescue of any trapped personnel shall be provided including Adequate aisle ways routes of exit Alarms audible and visual that operate immediately on detection of the fire Signs in accordance w...

Page 7: ...e control panel For ease of install servicing and more efficient field wiring Splitter Leads should be installed in areas easy to access and minimise extension leads Installation 8 1 FirePro generator...

Page 8: ...ntre If swallowed IMMEDIATELY contact Doctor or Poisons Information Centre show this container or label This material and its container must be disposed of as hazardous waste FIRST AID MEASURES SWALLO...

Reviews: