5.

 

Installation of FirePro Generators 

FirePro Condensed Aerosol Fire Extinguishing System Arrangement. 

 

FirePro units and system components installed to allow inspection and maintenance. 

 

Locate  FirePro  units  where  they  are  not  exposed  to  mechanical  damage,  exposed  to  chemicals,  or  weather 
conditions, that may render them inoperative.  Protective provisions shall be adopted, if necessary. 

 

FirePro units shall be securely installed. Use heavy duty brackets where necessary.  Brackets should be capable 
of handling the risk environment, including vibration. 

FirePro units must be installed at NOT less than the minimum safe distances as 

specified in the design calculations. 

 

Means for prompt rescue of any trapped personnel shall be provided, including: 

 

Adequate aisle ways/routes of exit. 

 

Alarms 

 audible and visual, that operate immediately on detection of the fire. 

 

Signs in accordance with relevant standards for the installation. 

System  components  shall  be  positioned  to  the  minimum  clearances  from 

energized electrical parts as per: AS 4487 and AS 3000. 

 

Handling and Storage - when handling the Condensed Aerosol Generators do 
not: 

 

Disassemble the unit  

 

Carry  out  any  welding  work  in  the  vicinity  of  the  fire 
extinguishing system components. 

 

Exert force or impact which creates physical or 
mechanical damage to the casing. 

STORAGE and OPERATIONAL CONDITIONS 

 

Temperature: 

54 and +54°C 

 

Humidity: maximum 98% RH 

 

Service life: 15 years (date of manufacture appears on each generator) 

Positioning 

 

 

 

CORRECT 

FP Units directing the aerosol stream away from opening 

 

INCORRECT 

FP units are directing the stream towards the opening. 

 

 

 

Summary of Contents for FPC-2

Page 1: ...Maintenance Manual Table of Contents 1 Introduction 2 2 Operation 2 3 Panel Operation 2 4 Installation and Mounting 3 5 Installation of FirePro Generators 5 6 Connecting to Master Fire Panel 6 7 Maint...

Page 2: ...r heat detection cable or smoke detector the red Fire indicator will be lit the FirePro Aerosol Generators will operate and immediately discharge extinguishing Aerosol into the protected area the inte...

Page 3: ...erminals along the top of the circuit board Cabling must comply with the Australian Standards The resistance of any cable must not exceed 25 ohms Terminals are capable of accepting wires of up to 2 5m...

Page 4: ...or other device Cabling Requirements Cable Requirements All cabling in the FirePro Installation MUST be done using 0 75mm shielded Fire Rated Cable Care taken to ensure that all cables are isolated a...

Page 5: ...t rescue of any trapped personnel shall be provided including Adequate aisle ways routes of exit Alarms audible and visual that operate immediately on detection of the fire Signs in accordance with re...

Page 6: ...Control port on the Detection card top card or by releasing the read switch by opening the inner Perspex door 1 Move the Write Enable switch to the right on the Detection Card top card The System Mod...

Page 7: ...will require connection back to the master panel To make the FPC 2 compatible with an addressable input module move jumpers J1 and J2 from their default positions position A to position B The FIRE NO...

Page 8: ...e fuse will blow on EACH test Note If the system has been activated the system activation fuse needs to be inspected as blown fuse will show as a fault The Fuse is 1 6AMP Quick Blow 9 Specifications M...

Reviews: