HEF7 series manual 16
EVAPORATIVE PANEL DRYING TIME
To ensure complete drying of the cooling pad, after a work period, the air fan of the UTA must be working during the
times set out in the following table:
Before drying the evaporation panel, the ventilation must be stopped for 10 minutes and watering continued with the
cassettes. This is done by keeping the water recirculation or direct water irrigation to remove all possible minerals
stuck to the panel. Afterwards, the recirculation is turned-off and the ventilation system re-started for the estimated
time on the above table.
Summary of Contents for HEF7 Series
Page 2: ...HEF7 series manual 2...
Page 12: ...HEF7 series manual 12 5 Unit components 1 2 4 3 7 5 6...
Page 34: ...17 Machine conformity declaration...
Page 35: ...18 Cuasi machine conformity declaration...
Page 36: ...19 WARRANTY...
Page 37: ......