Maintenance Instructions
Seite/Page 114 Panda_4800i PMS_eng.R04 - Kapitel/Chapter 6: Maintenance Instructions
14.2.13
6.16 Replacing the fuses
NOTE:Representative procedure
The described procedure is representative for Fischer Panda generators.
The original location of the item must be taken from the generator descrip-
tion of this manual. This replacement can be done by the user.
The fuses should be replaced every 2000 operating hours.
Fig. 6.16-1: Fuse
Figures similar!
1. Remove the two fixing screws of the plastic cover using a
size 0 or 1 phillips screwdriver.
Fig. 6.16-2: Fuse
2. Remove the plastic cover.
Fig. 6.16-3: Fuse
3. Using the fuse extraction tool, remove the fuse and
replace it with a new one.
4. To reinstall, reverse the order of steps.
Summary of Contents for Panda 4800i PMS
Page 36: ...Seite Page 36 Panda_5000i_PVMV N_Book_eng R02 14 2 13 Leere Seite Intentionally blank Basics ...
Page 130: ...Seite Page 130 Panda_4800i PMS_eng R04 14 2 13 Leere Seite Intentionally blank Tables ...
Page 148: ...Page 148 Chapter 2 General operation 14 2 13 Intentionally left blank General operation ...
Page 156: ...Page 156 Chapter 3 Installation 14 2 13 Intentionally left blank Installation ...
Page 158: ...Page 158 Chapter 4 Maintenance 14 2 13 Intentionally left blank Maintenance ...
Page 164: ...Page 164 Chapter 6 Annex 14 2 13 Intentionally left blank Annex ...