background image

The two roof panels can now be placed into

Position making sure that the top of each roof
panel drops into the cutout at the top of the
front and rear panels

Take the front bar panel and post and place into position.

Make sure that the front of the bar panel is flush with
spar on the rear panel.

Screw the bar front panel into the rear panel as shown.
3 holes 75mm screws.

Next make sure that the bar panel is at a right angle
from the rear panel. This can be done by taking a meas-
urement from the side panel to the bar panel which is
approx 970mm and placing the bar front to this meas-
urement at the end where the post is fitted.

When this is done screw the bar front to the floor. 2

holes 75mm screws.

Once the roof has been screwed into
place all the front, rear and side panels
can be screwed into the floor in the
holes provided.  5 x 75mm screws.

Moving  to  the  inside  screw  the  75mm
screws at an angle through one roof spar into
the  other  spaced  accordingly  in  4  places.
Make  sure  that  both  roof  sections  are  as
close as you can get them as in. This has to
be done in situ as the angle of screw can be
different  in  different  situations,  which  is
why there are no pre drilled holes for this.

With the roof in place screw the 5 x 75mm

screws through the roof frame into the side
Panel to secure the roof both front & rear.

Summary of Contents for Home Garden Pub

Page 1: ...he most important thing when assembling the pub is that the ground on which the unit is to stand must be level If the ground is not level the unit will not be square and the unit cannot be correctly assembled Home Garden Pub ...

Page 2: ...s with a 10mm spanner or socket All holes are pr drilled and there are three For each corner Screwing the coach screws Next take the front panel and place into position with the side panel and position and screw in the same manner as the rear panel Once the three panels are together the roof brace can now be put into position The posi tion is marked on the top spar on both the front and rear panel...

Page 3: ...les for this The screw size is 60mm Take the window end panel with the windows fitted and position into place Screw into the rear panel withe the coach screws in the same way as the other panels Now the front panel with the door can be positioned into place and screwed with the coach screws into the side panel The two front panels can now be screwed together in the same way as the two rear panels ...

Page 4: ...ng the bar front to this meas urement at the end where the post is fitted When this is done screw the bar front to the floor 2 holes 75mm screws Once the roof has been screwed into place all the front rear and side panels can be screwed into the floor in the holes provided 5 x 75mm screws Moving to the inside screw the 75mm screws at an angle through one roof spar into the other spaced accordingly...

Page 5: ...e the bar header and place into position This can only done by putting the header in on an angle as shown Once into position screw through the header into the side frame and repeat at the other end of the header 2 holes at each end 5 x 40mm screws With the bar header in place screw the 5 x 75mm screws into the post ...

Page 6: ... of the building and butt up to the front on the building Next take the side fence and post and screw through the Side panel into the building making sure that the side panel is flush with side of the building 2 holes screws 5 x 75mm Screw the side fence into the floor as shown making sure that it is flush with the floor 2 holes screws 5 x 75mm Place the first roof into position using the side pos...

Page 7: ... roof panel Leaving the cen tre post in situ to support both roof sections 5 x 75mm screws Now screw the roof panels into the side posts first from the front and then from the side 2 x 5 x 75mm screws per post With the centre post in position supporting the roof sec tions Place the centre support beam into position mak ing sure that both of the roof panels drop into the cut out of the beam and pus...

Page 8: ...erfectly up right and screw the bottom blocks to hold into place 2 x 5 x75mm screws Then screw through the support beam into the top of the post from the front 2 x 4 x 75mm screws The cover latts can now be nailed into place where the two front and rear panels join Finally nail the corner latts onto each of the four cor ners where the panels join ...

Reviews: