F1300N Rotary Table Operating Manual
Section 4: Programming Example
Rev A, February 2018
© 2017 Fisnar Inc. l Website:
www.fisnar.com
l E-mail:
info@fisnar.com
27
Instruction
Display Shows
1
Turn on Rotary table and touch the HMI screen to
open the production Screen
2
Open the test screen and press the cylinder
on/off, to turn it “ON” and drive the cylinder to the
bottom position.
3
Maneuver the tip into the required location on the
part to be dispensed onto and lock the axis into
place.
4
When the tip is in the correct position, press the
cylinder on/off button, to turn it “OFF” and drive
the cylinder back to the top position.
5
Open the Production screen, to start teaching.
6
Touch the values box for the Dispense angle on
the HMI screen to open the numbers box and
select the required angle of dispense.
7
Touch the values box for the tail angle on the HMI
screen to open the numbers box and select the
required angle of tail for the end of the material.
8
Touch the values box for the rotation delay on the
HMI screen to open the numbers box and select
the required time delay required for the
application.
9
Touch the values box for the Dispense delay on
the HMI screen to open the numbers box and
select the required time delay required for the
application
10
Touch the values box for the rotation speed on
the HMI screen to open the numbers box and
select the required rotation speed for the
application