Occasionally our products contain components that are
pre-lubricated at the factory. We recommend that you
protect flooring, or anything else the parts may contact,
with newspaper or cloth.
ASSEMBLY INSTRUCTIONS
NOTE: All location references, such as front,
rear, left or right, made in these instructions
are from the user being on the equipment
and facing forward.
Tools Required (included):
Allen Wrench 5mm & 6mm
Phillips Screwdriver
Socket Wrench 17mm
Open End Wrench 17mm
EEL1406R
Right Foot
Platform
EEL1406L
Left Foot
Platform
EEL1402-6R
Right
Swing Arm
Assembly
NB8015FB
Fastener Bag
(Steps 1-9)
Right
Frame
Tube
Left
Frame
Tube
EEL1403L
Left Rocker
Arm
EEL1403R
Right Rocker
Arm
EEL1402-6L
Left
Swing Arm
Assembly
NB9010
Water Bottle Holder
NB9008
Swing Arm
Covers
NB9013
AC
Adapter
EEL1405L
Left Handlebar
Assembly
EEL1405R
Right
Handlebar
Assembly
EEL1402
Upright Frame Assembly
NB9009
Water
Bottle
EEL1407
Stationary
Handlebar
Assembly
EEL1401
Base Frame
Assembly
EEL1404R
Right
Foot
Tube
EEL1404L
Left
Foot
Tube
EEL1412
Monitor
5
Lay all the parts out
on the floor as shown
to familiarize yourself
with them.
– TOP LAYER –
– MIDDLE LAYER –
– BOTTOM LAYER –
NB9015-11
Tool Bag
Summary of Contents for 1400
Page 15: ...14 EDGE 1400 EXPLODED VIEW ...