28
FIGURE 13
Step 71.
Step 72.
Step 73.
Step 74.
Step 75.
Step 76.
Step 77.
Step 78.
Step 79.
Attach two PULLEYS (76) to LEG PRESS SUPPORT (23) with 3/8” x 4-1/2” HEX BOLT (57), 3/
8” WASHERS (62) and 3/8” LOCKNUTS (67).
Attach a PULLEY (76) to four SINGLE BRACKETS with 3/8” x 2” HEX BOLT (51), 3/8” WASH-
ERS (62) and 3/8” LOCKNUT (67).
Insert PULLEY (76) into SLOT of LEFT OBLIQUE FRAME (4) and fasten with 3/8” x 2-5/8” HEX
BOLT (53), 3/8” WASHERS (62), 13mm BUSHINGS (46) and 3/8” LOCKNUT (67).
Attach two PULLEYS (76) to DOUBLE BRACKET with 3/8” x 3-1/2” HEX BOLT (56), 3/8” WASH-
ERS (62) and 3/8” LOCKNUT (67).
Attach one end of SQUAT CABLE (68) to CABLE LOCK on LEFT BASE BEAM (6) with M8 x
25mm HEX BOLT (48), M8 WASHERS (64) and M8 LOCKNUT (69).
The other end of the SQUAT CABLE (68) can be inserted around all remaining PULLEYS (76) as
shown in FIGURE 13 and DETAIL. Follow the cable route starting at position “A” and ending with
position “K”.
Attach CHAIN (91) to end of SQUAT CABLE (68) with CHAIN HOOK (90).
Attach other end of CHAIN (91) to PRESS CABLE (55) with CHAIN HOOK (90).
NOTE: The CHAIN is used to remove large amounts of slack in cable. The HEFT CABLE AD-
JUSTER is used to remove small amounts of slack.
Make sure SQUAT CABLE (68) is riding in groove of PULLEYS (76).