NOTES BEFORE INSTALLATION
2-1. General Inspection
2-1-1. Inspect IF the specifications are in compliance with the requirements
2-1-2. Inspect IF the hoist is damaged during the process of carrying
2-1-3. Inspect IF all parts on the following are enclosed:
(1) Button switch
(2) Fuse
(3) Structural drawing
(4) Circuit diagram
(5) Wire rope
(6) Other specific demands
2-2. Insulation
Inspect the resistance of insulation system: Using 500V high-impedance metre to measure
if the resistance of each individual part is above 1ΜΩ
2-3. Rail
2-3-1. A device in condition of rest should be set on the rail
2-3-2. The gap between each rail connection should NOT exceed 0.8 cm
2-3-3. The installation of rail should be complied with government regulations and be sure
to keep the level at transversal and horizontal directions to avoid instability during
operations
2-4. Notes of installation on power feeding system
Type of safety rail:
(1) The fixing clamp should be in the same line and level
(2) The welding of towing-arm should be formed as squared-iron stick
(3) Fix-squared- bar should be in parallel with the surface of safety rail, and the
distance is 70+10 mm
2-5. Distribution of the control panel (electricals):
For standard specifications, please refer to circuit diagram: Fig. 1, 2, 3, 4, and 5; for others,
kindly refer to the circuit diagram inside the box of control panel.
2-6 Voltage:
If the voltage is less than 5%, the motor will not reach the operating voltage; thus, before
using the hoist, kindly check if the voltage is normal or not.