Length of cable runs 

 

Environmental conditions  

 

Access for service repair (if applicable) 

Note: Please see detailed instructions for rack mounting in section 3.1.3 

3.1.2  The  X2000  shall  be  installed  to  conform  to  the  standards  designated  by 

the customer and manufacturer specifications as to the unit location and 

type of installation 

 

3.1.3  The following rack mount instructions should be followed 

 

A) Elevated Operating Ambient - If installed in a closed or multi-unit rack 

assembly,  the  operating  ambient  temperature  of  the  rack  environment 

may  be  greater  than  room  ambient.  Therefore,  consideration  should  be 

given to installing the equipment in an environment compatible with the 

maximum ambient temperature (Tma) specified by the manufacturer. 

B)  Reduced  Air  Flow  -  Installation  of  the  equipment  in  a  rack  should  be 

such  that  the  amount  of  air  flow  required  for  safe  operation  of  the 

equipment is not compromised. 

C) Mechanical Loading - Mounting of the equipment in the rack should be 

such  that  a  hazardous  condition  is  not  achieved  due  to  uneven 

mechanical loading. 

D) Circuit Overloading - Consideration should be given to the connection 

of the equipment to the supply circuit and the effect that overloading of 

the  circuits  might  have  on  overcurrent  protection  and  supply  wiring. 

Appropriate  consideration  of  equipment  nameplate  ratings  should  be 

used when addressing this concern. 

E)  Reliable  Earthing  -  Reliable  earthing  of  rack-mounted  equipment 

should  be  maintained.  Particular  attention  should  be  given  to  supply 

Summary of Contents for X2000

Page 1: ...Five9 Network Systems LLC X2000 Installation Manual Document 000001 Rev III 03 2012 Page 1 Five9NS X2000 Rack Mount Server Workstation Installation Manual ...

Page 2: ...rk Systems LLC NASA ARC B566 Suite 100 Moffett Field CA 94301 USA All rights reserved This product or document is protected by copyright and distributed under licenses restricting its use copying distribution and decompilation No part of this product or document may be reproduced in any form by any means without prior written authorization of Five9NS and its licensors if any ...

Page 3: ... Equipment 4 1 3 Optional Equipment 4 2 0 Application 5 2 1 Introduction 5 2 2 Typical Application 5 3 0 Installation 6 3 1 Prior to Installation 6 3 2 Unpacking and Inspection 6 3 3 Cautions Warnings 7 3 4 Wiring 7 3 6 Physical Characteristics 7 3 7 Electrical Characteristics 8 3 8 Post Installation Test 9 4 0 Optional Equipment Installation 10 4 1 Speaker Mounting 10 4 2 IO Card Installation 12 ...

Page 4: ...from dual core to quad core which are carried as a part of the Intel Embedded IA Extended Life Cycle Support In the recommended installation the unit receives power from an AC power source and can be either sitting on a table top or in a rack mount enabling both workstation or server modes 1 2 2 It supports Solaris which is the most scalable and secure operating system With Solaris the X2000 serve...

Page 5: ... can be placed on a table top Connect a monitor and other required IO peripherals through the connection ports on the system When mounting it sideways please make sure the system is stable NOTE WHEN USED IN A SIDE MOUNT CONFIGURATION THE POWER SUPPLY SHOULD BE ON THE BOTTOM SIDE 2 2 2 In cases of rack mount environments X2000 will be installed above or below other servers Specific rack mount instr...

Page 6: ...iven to installing the equipment in an environment compatible with the maximum ambient temperature Tma specified by the manufacturer B Reduced Air Flow Installation of the equipment in a rack should be such that the amount of air flow required for safe operation of the equipment is not compromised C Mechanical Loading Mounting of the equipment in the rack should be such that a hazardous condition ...

Page 7: ...ined from Five9NS 3 3 Cautions and Warnings 3 3 1 Do not remove any factory installed screws 3 3 2 Do not install near heat sources 3 3 3 ESD Electro Static Discharge guidelines shall be followed when installing the optional equipment 3 3 4 CAUTION Risk of explosion if battery is incorrectly replaced Replace only with the same or equivalent type recommended by the manufacturer Dispose of used batt...

Page 8: ...using the appropriate hardware 3 5 3 When sitting on a table top avoid uneven or unstable work surfaces 3 6 Electrical Characteristics 3 6 1 Electrical Specifications Electrical Input Voltage 100 240 Vac Input Current 8 4 Amps max Input Frequency 60 50 Hz 3 6 2 Power Switches The X2000 has 3 power switches a System Power Switch and a System Reset Switch in the front as well as a general On Off swi...

Page 9: ...e the X2000 is properly installed turn the system on and verify using a monitor that the motherboard is booting up To test with Solaris 10 use the following guidelines Login as root Open a shell window and type in the following commands cd usr sunvts bin startsunvts You will have to choose between different interfaces to run SUNvts with Choose the command line option and enter the following comman...

Page 10: ...guide for more information 4 0 Optional Equipment Installation 4 1 Speaker mounting 4 1 1 In order to mount the speaker and IO card you need first to remove the top cover Make sure you have anti static protection 4 1 2 Remove the 120 mm fan first as shown in the picture below 4 1 3 Place the speaker on the bottom left on the X2000 unit and fix it using the bolts and nuts provided in the additional...

Page 11: ...2000 Installation Manual Document 000001 Rev III 03 2012 Page 11 4 1 4 Make sure the speaker cable is to the left side of the unit as shown below to be able to run the cable easily between the chassis and the left side of the fan ...

Page 12: ...nt 000001 Rev III 03 2012 Page 12 4 2 IO Card Installation 4 2 1 Insert the IO Card in the PCIe slot as shown below 4 2 2 Plug the USB cable inside the unit to the IO card as shown below 4 2 3 Plug the audio cable from the speaker to the IO card as shown below ...

Page 13: ... LLC X2000 Installation Manual Document 000001 Rev III 03 2012 Page 13 4 2 4 Note how the routing of the speaker cable is performed 4 2 5 After connecting both cables the connections should be similar to the pictures below ...

Page 14: ...Five9 Network Systems LLC X2000 Installation Manual Document 000001 Rev III 03 2012 Page 14 4 2 6 Do not forget to screw the IO Card to the chassis and reinstall the top cover ...

Reviews: