STEP 14
CHECKLIST FOR SEALED BURNER INSTALLATION
MAKE SURE ALL CONTROLS ARE IN THE “OFF” POSITION.
Gas supply is “on”
Electric power is “on”
Check for proper seating of burner caps into burner base
Burner grates in position
Oven and broiler racks installed
Surface burner ignition test
Electric oven – Check bake and broil function
Check operation of convection fan
MAKE SURE ALL CONTROLS ARE LEFT IN THE “OFF” POSITION.
Date Installed & Inspected __________________________________________________
Authorized Installer’s Signature _____________________________________________
Please Print Name ________________________________________________________
NOTE: Please leave this checklist, Use & Care manual and product registration
card with the Homeowner.