STEP 13
CHECKLIST FOR SEALED BURNER INSTALLTION
MAKE SURE ALL CONTROLS ARE IN THE “OFF” POSITION.
Gas supply is “on”
Electric power is “on”
Check for proper seating of burner caps into burner base
Burner grates in position
Oven and broiler racks installed
Surface burner ignition test
Griddle/Grill burner ignition test
Griddle/Grill assembly in position
Gas oven ignition test
Check operation of convection fan
MAKE SURE ALL CONTROLS ARE LEFT IN THE “OFF” POSITION.
Date Installed & Inspected _________________________________________________
Authorized Installer’s Signature _____________________________________________
Please Print Name ________________________________________________________
NOTE: Please leave this checklist, Use & Care manual and product registration
card with the Homeowner.