59
Precautions of operation data:
1. Historical operation data is the operation data accumulation of each
Guidance line.
2. The latest operation is placed on the top of the list, sorted by date.
3. The date on the list is the date on which the field was saved, not the date
of the last job operation.
4. The acre and time are cumulative items of historical operations instead of
a single data of the latest operation.
5.3 Settings
Figure 3.5.3 Setting list
The user clicks "Setting" to expand the setting details page and display the
setting items.
©FJ Dynamics Technology Co., Ltd. All rights reserved.