40
Figure 3.3.18 Guidance line imported
3.2 Preparatory Operation for Advanced Mode
Confirm RTK connection → Add and select field → Add and select boundary
→ Add and select guidance line → Add and select task setting → Confirm task
configuration → Start operation
Figure 3.3.19 Preparatory operation flow chart
3.2.1 Confirm RTK Connection
Before preparing the operation, please confirm the current RTK connection.
For the specific operation steps, see 3.1.1 Confirm RTK connection.
3.2.2 Add and Select Fields
Click "Task" button on the left to enter the task configuration interface. First,
©FJ Dynamics Technology Co., Ltd. All rights reserved.