Step #1 --SECURING BASE FLANGES
Sit the building boxes in the chosen location. Remove all the components
from packaging to ensure all components are present by checking with the
Part List.
s
lr)
.....-<
s
lr)
.....-<
3.0m
1.5m
1.5m
0
0
0
0
0
0
Figure 3 Position of Base Flanges
Figure 4
As Figure 4 shows, each base
flange has two stake pegs.
Begin by determining exact location of the four (4) corners of the building. Mark front edge
and side-to-side width of assembly on ground. Drive alignment stakes into the ground
outside of the markings, and draw alignment strings along both ends and sides of the
building to the dimensions shown in Figure 3. The outline of the strings will represent the
final location of the base flanges. The initial location of each Corner Base Flanges is critical
to the alignment and fit of the frame components and cover.
Locate the Left Corner Base Flange and Right Corner Base Flange. Secure the base flanges
with Stake Pegs (Part #9). Measurements shown in Figure 3 are to the center of the upright
sockets on each Base Flange.
The Shelter must be secured to a firm surface that can receive and retain pegs firmly in
position. The shelter should be installed on FIRM GROUND, not on SWAMP, SOFT/WET
GROUND. The Base Flanges must be secured so they cannot be moved. Arches are
tensioned at their base as they insert into the Base Flange sockets.