background image

 Fläkt Woods 

9206 GB 2011.11 

2

 

Specifications are subject to alteration without notice

Maintenance

LQQA Humidifier, for circulated water

Maintenance adjustments (Contd.)

The humidifier function:

–  switch on the power supply to the humidifier.

  The water tray will start to fill with water.

Check:

–  that the pump has started and that it is pumping

  water. If there is no water flow, change the direction  

  of rotation of the pump, see Fig. 5.

–  preset the required supply water flow rate according

  to Table 1. This is done by setting the adjustment

  screw on the flow controller, shown in Fig. 4.

–  that water is being discharged from all of the holes

  in the spray pipe(s). If any holes are clogged, use a

  needle to unclog them. If the spray pipe(s) is/are

  extremely clogged, remove the end plugs (17), brush

  inside them using a round brush and then flush

  them clean.

– that the flow of supply water stops when the water

  level in the tray reaches level monitor A.

– that water bleed-off can be done by manually opening

  the drain valve approx. half way (45°), see Fig. 3. 

  The valve can be reclosed by pressing a reset button  

  on the control unit. When the water level has drop-

  ped below the lowest point of sensor B, the drain 

  valve should open fully. If the water level continues 

  to drop below the lowest point of sensor C, water  

  inlet valve should begin to open and after a preset 

  period (see Table 2, Fig. 6) the drain valve should 

  start to close. When the water reaches level C, the 

  pump should soon stop.

  (The pump should not run when the water level is

  below level C.)

–  The preset period on the time relay should be according

  to Table 2, 3 and Fig. 6. 

Droplet eliminator

The droplet eliminator fills must be correctly fitted for

the direction of air flow, see the arrow on the droplet

eliminator.

EUQA 2;1 

Fig. 3

Fig. 4

0

0

2

4

2

4 6

30

20

10

EUQA Pump

Adjusting screw

Reading point

Fig. 5

Table 3. Supply water flow

  Size 

Supply water flow, l/min

 

           

Aluminium 

 

 

90% 

60% 

 
  60 

30 

15 

  62 

40 

20 

  64 

50 

25 

  71 

40 

20 

  73 

50 

25 

  80 

40 

20 

  82 

50 

25 

  84 

60 

30 

Summary of Contents for LQQA

Page 1: ... at which setting level monitor B Fig 2 is to be preset Level monitor C Stops the circulation pump and opens the water supply valve if the water level drops below level C Setting C 25 mm from the bottom of the water tray sizes 60 84 Level relays NR 1 NR 2 and NR 3 are shown in Fig 7 The level relays are preset at a sensibility of 40 kΩ If softened water is used and the level monitors don t work th...

Page 2: ...evel in the tray reaches level monitor A that water bleed off can be done by manually opening the drain valve approx half way 45 see Fig 3 The valve can be reclosed by pressing a reset button on the control unit When the water level has drop ped below the lowest point of sensor B the drain valve should open fully If the water level continues to drop below the lowest point of sensor C water inlet v...

Page 3: ...ect a Time of 24 black digits Table 2 Presetting the time relay Table 3 Presetting time relay TR1 Size Time required for emptying Normal operation preset value High humidification over a long period Δx 8 gram Δx 5 gram 90 60 90 60 60 62 64 30 60 60 0 0 30 30 90 240 0 0 120 71 73 60 90 30 60 180 240 90 120 80 82 84 90 90 120 60 60 60 180 240 300 120 120 120 Range Time ETR4 69 A Function 1s 1 5 5 12...

Page 4: ...aken into account To ensure acceptable performance the concen tration of Cl in the fresh water must not exceed 50 mg l and that of Cu must not exceed 0 02 mg l To set the timer for emptying and flushing For normal function the timer should be preset to ON When emptying which can be programmed to occur once or several optional times every 24 hour period the timer will reset itself to the OFF settin...

Page 5: ...umbers on the display Choice of function Ex Auto Prog Pulse Cycle Delete The timer has also been preset for the following Summer and winter time in the country where it is to be used Date and time in the time zone where it is to be used Change of current time of day 1 Press menu 2 times flashes 2 Press OK Display shows YEAR change with or 3 Press OK Display shows MONTH change with or 4 Press OK an...

Page 6: ... m Max pH of aluminium Bikarbonate HCO 3 mg l P r e c i p i t a t i o n z o n e T r a n s i t i o n z o n e S a f e z o n e Determining the water quality zone The following particulars are required to be able to deter mine the water quality zone the pH of the water the bicarbonate concentration HCO3 mg l the calcium concentration Ca2 mg l This data can be obtained from a municipal water autho rity...

Page 7: ... tray guide rails or electric cables E Thefillsarerelativelyfragileandthereforeshould betreatedwithgreatcare Cleanbysprayingwitha jetofcleanwater possiblycontainingtheULCZ 01 cleaning agent When replacing the humidifier fills see the appropriate instructions supplied with the new fills F Refit the components in the reverse order G Check the position of the spacer plate and close the door To clean ...

Page 8: ... 12 Bleed off Level relay Maintains correct level Level relay L3 L2 L1 2 1 0 1 3 4 5 6 PE I I I 1 5 3 2 4 6 W U V 3 M 2 1 F1 HB Q1 Q2 K1 K2 CP1 CP2 6 4 2 5 3 1 N N SU1 A2 A1 Timer Emptying Flushing 6A A2 A1 R1 Auxiliary relay Emptying Flushing SU1 4 3 5 TF c no 1 2 CP1 Contactor A2 A1 K1 GM c no 3 4 15 16 18 15 18 16 15 18 16 MV1 11 12 Solenoid valve Valve actuator SV1 13 15 14 3 2 1 NR1 A1 A2 B1 ...

Reviews: