HyPower-Geko
Maintenance and Troubleshooting
FläktGroup DC-2014-0022-GB 2018-05/R5 • Subject to modifications
125
Pos. 1:
Fastening screws
(2 per side)
Pos. 2:
Fastening screws
2 per side)
Pos. 3
Fastening screws
2 per side)
Pos. 4
Fastening screws
6 per side)
Pos. 5
Heat exchanger
•
Check the inner wall insulation (see fig. 8-10, Pos. 1, applies only to basic units with
fan section type "C") on all sides for soiling/microbial growth. In the event of the
strong microbiological contamination of the insulation of type C, please exchange
the entire fan chamber (Spare part No. ZGH.#A0C1).
Pos. 1:
Insulation
Pos. 2:
Fixing screws
(2 per side)
•
Mount all components in the reverse order
•
After that, check the heat exchangers and valve connections if required for firm
seat and tightness.
•
Check proper operation of condensate drainage and if applicable, the on-site trap
provided by others.
8.3.8 Check the valves
•
Check the proper operation of valves as described in Chapter 7.2
Fig. 8-9:
Dismounting heat exchanger
Fig. 8-10: Checking insulation