HyPower-Geko
Mounting
FläktGroup DC-2014-0022-GB 2018-05/R5 • Subject to modifications
31
•
Ensure that there is enough space available for valve installation.
•
Ensure connection possibility for the mounting brackets (examples in fig. 4-5).
•
Use bolts/screws to fix the HyPower-Geko unit.
•
Use a spirit level to exactly align the HyPower-Geko in longitudinal and lateral di-
rection (refer to fig. 4-6).
•
Tighten the fixing bolts.
Pos. 1: Ceiling construction
Pos. 2: Threaded rod M8 (on-site)
Pos. 3: Z-Profile (on-site)
Fig. 4-5:
Examples of mounting variants
Pos. 1: Assembly mountings
Pos. 2: Suspension rail
Pos. 3: Track adapter
Fig. 4-6: Assembly of the HyPower-Geko
User instructions!
Unobstructed condensate drainage is ensured only in horizontally mounted cooling
units.