Mounting
HyPower-Geko
38
FläktGroup DC-2014-0022-GB 2018-05/R5 • Subject to modifications
4.4.7 Installation intake/discharge plenum and seal cap for round connector DN250
User instructions!
The intake/discharge plenum with round connector DN250 is delivered with sepa-
rately enclosed adhesive tape provided for the seal between the flange of the box
and the unit with fan section or the discharge-transition piece, or intake/discharge-
sound attenuator or flexible canvas connection.
Pos. 1:
Discharge transition piece
Pos. 2:
Discharge plenum
Pos. 3:
Screw M8x25, washer, nut(4 pcs)
Pos. 4:
Round connector DN250
Pos. 5:
Cover cap DN250
The assembly of the air intake plenum
(ZGH.#A031) to the inlet side is only possible if
the basic unit is furnished with a fan section or
if the unit is furnished with a discharge transition
piece on the discharge side (discharge plenum
ZGH.#A042).
•
Stick the adhesive tape on to the flange.
•
Fasten the box to the discharge transition
piece or to the fan section with M8 screws
(washers, nuts).
For units which are furnished with an intake or
discharge plenum, unused round connectors
can be closed with a seal cap (ZGH.0A711(inlet
side), ZGH.0A712(discharge side)).
•
Insert the cover cap(s) on the round connec-
tor(s) to be closed and secure by using ad-
hesive or insulation tape.
Fig. 4-15: Installation intake/discharge plenum and seal cap for round connector DN250
User instructions!
In order to avoid air side losses, the connection between the round connector and
on-site ductwork by others and/or cover caps must be sealed by others!
Stick on insulation tape