10
6- You can start to add chimney sections. We recommend that you also use locking bands to secure all
connections. You will need to secure the chimney to the house using wall bands. Wall bands wrap
around the chimney and then attach to the wall. Install the first one 3 feet above the wall support.
Then, you will need another band for each 8 feet of chimney.
Note: if your
chimney must be
installed through your soffit, install a roof flashing above and finishing
plate below where
the
roof is cut. Consult the following section called “CEILING SUPPORT SYSTEM” for more
details.
7- Authorities require that the chimney extend not less than 3 feet above the highest point where it
passes through the roof of a building and not less than 2 feet above any portion of the building within
10 feet. If the chimney extends more than 5 feet above the roof deck, roof guys with telescoping
legs and draw bands are required.
8- Finally, twist on your rain cap and you can head back inside.