13
TRANSLATION OF THE ORIGINAL INSTRUCTIONS (Keep for future reference)
Document Code
Rev.
Date saved
Date printed
U300 INSTRUCTIONS
01
09/02/2016
09/02/2016
EN
[+#$!##\+#+"[+#$+#"
In the U300 machine, the magazine (E) can hold V-nails of different
heights but only one V-nail height can be used at a time, depending
on the nailing head installed.
When the size of the V-nails is changed the nailing head must also
be switched over to match the V-nails used.
The V-nails are held in position by the V-nail pusher device (F).
Head and L-block support are designed to guide the V-nails during
the thrust action of the hammer and their insertion into the overlying
mouldings.
The magazine is in turn brought up against the L-block support and
by means of a V-nail pusher supplies and aligns the V-nails against
the guide each time the hammer is activated.
The hammer is activated by a pneumatic cylinder which is controlled
by the pneumatic pedal.
Perfect mechanical alignment of these parts ensures precise
insertion, single or multiple, of the V-nails in the mouldings to be
&<[&%?j#&%%\#&<>%?%?"#$&j<
(A)
Screw for fastening the head.
(B)
Head of different heights.
(C) L-block
support
(D) Hammer
(E) V-nail
magazine
(F)
V-nail pusher which keeps the V-nails at a constant pressure
"##&%%?&&%
(G) PLV selector lever:
in the OFF position (open) it draws the V-nail pusher back so
%?#%&#*$#&'"%&%?!##`&
in the ON position (closed) the V-nail pusher pushes the
&#*##&%%?&&%?&&%?"%&[#**
$*#!"&#&<&$!!#&<#<#$%@#%<#&<%?"<#*
does not work.
G
A
B C
D
E
F