20
TRANSLATION OF THE ORIGINAL INSTRUCTIONS (Keep for future reference)
Document Code
Rev.
Date saved
Date printed
U300 INSTRUCTIONS
01
09/02/2016
09/02/2016
EN
3. PRELIMINARY PREPARATION AND ADJUSTMENT PROCEDURES
3.1. POSITIONING
#'$(*=g**j))*+=#&
The machine must be positioned on a solid, reinforced concrete foundation.
?^!%?#@#&#<j#%*#<'#&$#"#$%\%""%%?>?%%?!#$?&?^!%'<&<#&<""#<
by the user.
3.2.
LEVELLING THE MACHINE
Stability of the machine is designed in such a way that, in the
"$<$&<%&"#%&[%$#&'<>%?%
overturning, falling, or uncontrolled displacement.
In order to avoid mechanical stress during normal use of the machine
and undue strain to the structure, the machine must be stabilised
during lifting operations.
The standard machine is supplied ready assembled on the stand
which is secured to a pallet (A).
Unscrew the 4 screws positioned under the pallet to remove
the machine. Install the 4 feet (B) using the relative wrench. It is
important to stabilize the stand by turning the threaded pin on each
support foot (C) by means of the special wrench.
Preparation on site
The machine layout is provided as an attachment to this manual. It is
$!"*%>%?%?&$#\<#%#"%&&&%?#$%\^
THE PLACE IN WHICH THE MACHINE IS USED must be clean
#&<'%#$*
TO ALLOW FOR EASY REMOVAL OF THE MACHINE FOR
MAINTENANCE it must be positioned in a place having the surface
<!&&&<$#%<&%?
C
B