27
TRANSLATION OF THE ORIGINAL INSTRUCTIONS (Keep for future reference)
Document Code
Rev.
Date saved
Date printed
U400 INSTRUCTIONS
01
02/10/2015
02/10/2015
EN
4.4. START-UP
&%%?$!"<#""*\$&&$%&%%?!#$?&]&*%%?*%&%
is present, insert the compressed air supply connector into the unit’s inlet.
++\+#$+$*#"
Insert the V-nails as follows:
(A)
Turn the PLV valve (1) lever to the OFF position.
(B)
the V-nail pusher cylinder is opened.
(C) Insert the stick of V-nails in the magazine (2), ensuring that the sharp part (glued edge) is facing upwards, and that the “V” is
positioned as shown in the photo.
(D) Turn the PLV valve (1) lever back to the ON position.
To insert the same type of V-nails in the magazine there is no need to
remove the loader. The stick can be inserted from the top by inserting
it through the free areas envisaged for moving the fence unit as
?>&&%?&#*&&%#?>&&
3
1
2