29
TRANSLATION OF THE ORIGINAL INSTRUCTIONS (Keep for future reference)
Document Code
Rev.
Date saved
Date printed
U400 INSTRUCTIONS
01
02/10/2015
02/10/2015
EN
\+#$+#"#$+!+
$?#&$#*#*&!&%%?&#*&?#<&$#\**>&+*&&$#<'\>"#%&[>#&$!"&&%[#!!&
<&&["*#$!&%"#%[!#&%&#&$?"#%>?$?&<%'#*&<>%?&#&%?#+?#<[}'*$""%[&#*
magazine and loader.
To perform mechanical alignment, proceed as follows:
1. Undo the socket head screw securing the head to the L-block support.
2. Remove the head from the “L”-shaped support.
3. Loosen the screws securing the L-block support to the carriage surface.
4. With the hammer in the high position, move the L-block support up against the hammer and tighten the socket head screws.
5. Move the magazine up against the L-block support after having loosened the two M5 screws locking the magazine in place.
6. Check that the coupling between the V-nail loader and the L-block support is perfect.
7. Insert a V-nail in the loader, move it up against the L-block support to check that the wings of the V-nail are perfectly in line with the
guide.
8. Replace the head on the L-block support and secure in place with the relative screw.
&%#%$&#*&%?*#<#&<$!!#&<&#*&>%?&!*<&%$?$$$%;"*&%?&#*?&#*
must run precisely between the L-block support and the head with minimum play and without any resistance.
1
2
3
4
5
6
7
8
9