Installation
4
4.
Positioning the Vertical Track Assembly
Parts Needed:
Tools
Two boxes approximately
the same height
¾
Tip: You can use the Tool Caddy Box and the Laser Box included with the FSC as supports.
1.
Lift the Vertical Track Assembly out of the box, and place it on the workroom floor.
CAUTION: To protect against personal injury, two people should lift the pre-assembled unit.
2.
Grasp the black handle of the Cutting Head, and slide it up to the top of the Vertical Track
Assembly.
3.
Lock the Cutting Head in position by turning the black knob to the right (black knob is located to
the left of the handle).
4.
Position one of the boxes next to the top of the Vertical Track Assembly.
5.
Carefully turn the Vertical Track Assembly over so it is resting on the box
(see Figure on page 3)
.
♦
Note: It is important that the Cutting Head is completely off the floor. The weight of
the machine can damage the Cutting Head.
♦
Note: If your FSC is to be a free-standing unit, please proceed to “Attaching the
Horizontal Brace Channel” on page 6.
5.
Removing the Rear Leg (Wall-Mount Only)
Parts Needed:
Tools
Two (2) 17mm Wrenches
1.
Using two (2) 17mm Wrenches, remove the M10 Hex Bolts from either side of the top of the
Rear Leg Mounting Bracket. Set them aside for later use.
2.
Remove the Rear Leg by sliding the top off of the Vertical Track Assembly.
3.
Locate the long M10 Hex Bolt that is connecting the two Front/Back Support Braces to the
bottom portion of the Rear Leg.
4.
Using two 17mm Wrenches, remove the M10 Hex Bolt and set aside.
5.
Fold the Front/Back Support Braces up, and lay them inside the Vertical Track Assembly.
6.
Using the long M10 Hex Bolt you just removed, secure the Front/Back Support Braces to
the Vertical Track Assembly by inserting the Bolt through the aligned holes at the top of the
Braces.