Installation
12
9.
Insert the one (1) M8 x 110mm Socket Cap Screw and two (2) Flat Washers through the
Horizontal Material Bar and secure the one (1) Lock Nut using a 6mm Hex Key and 13mm
Wrench.
♦
Note: Rotate the Spacer until it is flush with the Right Leg.
(Free-Standing Unit assembly continues at “Inserting the Production Stops” – see Section 20
.)
19.
Securing the Wall-Mounted Unit (Wall-Mounted Unit only)
Parts Needed:
Qty
Hardware
Tools Needed
2
M10 x 25mm Hex Head Bolt
(removed previously)
Two (2) 17mm Wrenches
♦
Note: If you extended the Front/Back Support Bars for better workspace, fold the
Bars back up and replace the long M10 Bolt.
1.
Locate the two (2) M10 x 25mm Hex Head Bolts that were previously removed when the
Rear Leg was detached from the Vertical Track Assembly.
2.
Insert them into the bottom two holes on the Rear Leg Mounting Bracket.
3.
Tighten the Bolts using two (2) 17mm Wrenches.
♦
Note: Make sure the all the Bolts and Screws are tight, so the FSC won’t move
around during operation.
20.
Inserting the Production Stops
Parts Needed:
Frame Parts
Left Production Stop Assembly
Right Production Stop Assembly
1.
Locate the Left Production Stop Assembly (it has the
small Red and Silver Fingers).
2.
Loosen the black Knob.
3.
Ensure the Fingers are to the right of the Knob, and slide the
Production Stop into the groove to the left side of the Horizontal
Material Bar.
¾
Tip: If the Production Stop does not slide on easily,
loosen the black Knob slightly.
4.
Repeat Steps 2 and 3 for the right Production Stop, sliding
it onto the right side of the Horizontal Material Bar.
Production Stops
View from the Right Side of the
Horizontal Material Support Extrusion