Installation
1
I.
Installation of the FSC
1.
Unpacking the FSC
Check the exterior of the packing box to make sure there is no visible damage. After
unpacking the unit, check to make sure all the parts are present and undamaged.
A.
Contents Include
:
•
Partially Pre-Assemble Framing Vertical Track/Anvil Assembly
•
Frame
Parts
(see Frame Parts below)
•
Box #1* - Tool Caddy
9
Tool
Caddy
9
2 Screws and Washers
•
Box #2* - Laser and Bracket Assembly
•
Box #3 - Holders, Stops, and Machine Hardware Box
9
3 Blade/Wheel Holders
9
2 Production Stops
9
4 Hex Keys
•
Box #4 - Frame/Stand Hardware Box
(see Figure on page 2)
* box is not labeled with number
Frame Parts
1.
Large
Face
Plate
5.
Horizontal
Material
Bar
2.
Center
Adjustable
Leg
6.
Rear
Horizontal
Brace
3.
Left
Leg
Bottom
7.
Horizontal
Brace
Channel
4.
Right
Leg
Bottom
8.
Small
Face
Plate
2
3
4
1
5
6
7
8