12
MHCP Primary Cleaner
Section 5 – Pre-Operation Checklist and Testing
5.1 Pre-Op Checklist
• Recheck that all fasteners are tightened properly
• Add pole caps
• Apply all supplied labels to the cleaner
• Check the blade location on the belt
• Be sure that all installation materials and tools have been removed from the belt and the conveyor area
5.2 Test Run the Conveyor
• Run the conveyor for at least 15 minutes and inspect the cleaning performance
• Check the tensioner spring for recommended length (proper tensioning)
• Make adjustments as necessary
NOTE: Observing the cleaner when it is running and performing properly will help to detect problems or
when adjustments are needed later.