9
Flexel
Installation Manual
Cable Kit Instructions
7) Final testing.
The electrician should test the continuity of the floor sensor (already fitted) and retest the connected
resistance of each cable. A further insulation test should be car ried out in accordance with IEE
regulations. The electrician should affix a suitable advisory warning label at the electricity
distribution board and complete the attached certificate which must be retained and serve as part of
the guarantee requirement.
8) Switching on.
Before switching on the underfloor heating allow a minimum of 3 days for natur al drying of the tile
adhesive and grout. Initially operate the system for 2-3 hours per day increasing to full continuous
operation after 6-7 days.
Flexel International Ltd
Queensway Industrial Estate, Glenrothes, Fife, Scotla nd, KY7 5QF
Tel: 01592 757313 Fax: 01592 754535
Flexel Ecofloor Underfloor Heating
Please complete and return this installation completion certificate within 10
days to Flexel International Ltd and retain a copy to validate the guarantee
Name:
Address:
Room fitted:
Cable type & wattage
Connected continuity (resistance) recorded
(ohms)
Signed by electrician:
Date:
Date of completion and test ing: