2
SUMMARY
SUMMARY
INTRODUCTION
4
1. INSTALLER SECTION
7
1.1. INSTALLATION
8
1.1.1. GENERAL INSTALLATION WARNINGS
8
1.1.2. BOILER LOCATION ENVIRONMENTAL REQUIREMENTS
8
1.1.3. REFERENCE LEGISLATION
9
1.1.4. BOILER OVERALL DIMENSIONS
10
1.1.5. JIG
10
1.1.6. CIRCULATOR PREVALENCE/FLOW DIAGRAM
11
1.1.7. GENERATOR INSTALLATION
12
1.1.8. HYDRAULIC CONNECTION
15
1.1.9. SYSTEM FILLING
16
1.1.10. FILLING THE CONDENSATE COLLECTION SIPHON
17
1.1.11. ANTI-FREEZE PROTECTION
18
1.1.12. GAS CONNECTION
19
1.1.13. ELECTRICAL CONNECTION
19
1.1.14. POWER SUPPLY
20
1.1.15. OPTIONAL ELECTRICAL CONNECTIONS
21
1.1.16. FUME EXHAUST FITTINGS
24
1.1.17. TYPES OF FUME EXHAUST SYSTEMS
25
2. SUPPORT CENTRE SECTION
29
2.1. FIRST START-UP
30
2.1.1. PRELIMINARY OPERATIONS FOR FIRST START-UP
30
2.1.2. BOILER COMMISSIONING
31
2.1.3. CO2 VALUE CHECK AND CALIBRATION
32
2.1.4. ACCESSING AND PROGRAMMING THE PARAMETERS
33
2.1.5. DIGITECH CS PARAMETERS TABLE
35
2.1.6. ELECTRIC FAN FREQUENCY/HEAT CAPACITY DIAGRAM
44
2.2. MAINTENANCE
45
2.2.7. GENERAL MAINTENANCE WARNINGS
45
2.2.8. TECHNICAL DATA
46
2.2.9. TECHNICAL ASSEMBLY
49
2.2.8. INTERNAL PIPING SCHEMATIC
50
2.2.9. WIRING DIAGRAM
51
2.2.13. ACCESSING THE BOILER
52
2.2.10. ACCESSING THE ELECTRONIC BOARD
53
2.2.11. SYSTEM EMPTYING
54