19
K 2 . 1
8.3. CONCEALED INSTALLATION
Lay the cable between the wall box and the ventilation
unit in the preinstalled conduit pipe. Fit the back piece
(item no. 2), over the wall box and click the cable in
directly from behind as in the illustration (se Fig. 8).
)LJ
J
8.4. SURFACE INSTALLATION
Lay the cable between the back piece (item no. 3), and
the ventilation unit. Cut out the perforation in the corner
of the back piece that is suitable for installation. Screw
the back piece to the wall with suitable screws. Click the
cable into the control panel from below, where there is a
socket in the printed circuit board (se Fig. 9).
)LJ
J
8.5. FINISHING OFF – CI60
6OLGHWKHSDQHORDVVKRZQE\DUURZQRVHH)LJ
DQGȴWWKHFRQWUROSDQHOVWUDLJKWLQWRWKHEDFNSLHFH
as shown by arrow no. 2 (see Fig. 11) until it clicks into
place. Slide the panel back on.
)LJ
)LJ
)LJ
1
J
2
8.6. FINISHING OFF – CI600
Fit the control panel over the hooks in the back piece as
shown by arrow no. 1 and then click the panel into place
at the bottom edge as shown by arrow no. 2 (see Fig.
12).
)LJ
1
2