FT-112(D) Panel Weighing Indicator, Technical Manual, Rev.1.0.0, May 2019
Page
18
of
170
Housing
Front view
Side view
Panel cut sizes
Mechanical Installation
Before starting the installation, prepare the weighing indicator location on the cabinet front.
Prepare the Protective Earth (PE) cable to grounding the FT-112(D) Panel housing. The protective earth
should be as good as possible for scale reliability.
Use high quality and EMC certified DC power source in the cabinet.
Follow the requirements on cabling. Refer to
page 16
Cut the panel of the cabinet to install the
instrument.
Insert the instrument into the panel after placing
the waterproof sealing rubber between the panel
and FT-112(D) Panel.
Place holder parts of the instrument to the both
side of the instrument.
Use 2 pcs M4 screws to mount the instrument to
the panel after alignment.
112,5 mm
(4.43")
91 mm
(3.58")
205mm (8.07") )
108 mm
(4.25")
186 mm (7.32")
92 mm
(3.62")