SHEET 11 OF 16
TRI-TOON ADD-ON KIT INSTALLATION
STEP 1
SLIDE CLAMPS TOGETHER (FIGURE 1.1) AND SLIDE PAIRS OVER CRADLE BEAM WITH POCKETS FACING
OUTWARDS (FIGURE 1.2). NOTE: IF CRADLE BEAM WELDMENT IMPEDES BOLT PLACEMENT IN UPRIGHT
CLAMPS, DRILL A 13/32” HOLE THROUGH THE 2” TUBES ON THE CRADLE BEAM (VSD10000
INSTALLATIONS ONLY (FIGURE 1.3).
2X
FIGURE 1.1
FIGURE 1.2
2X
FIGURE 1.3