background image

Step Seven

VAC Power Input Wiring:  

Observe the labeling on the con-

troller. Note: Polarity does not matter with the AC input terminal.

Relay Input Wiring:  

The relay is a single pole, double throw

type rated at 250 Volts AC, 10 Amps.  The terminals Normally Open
(NO) and Normally Closed (NC) will be used in different applica-
tions.  Remember that the "normal" state is when the relay coil is de-
energized and the Red relay LED is OFF (de-energized).

A typical application for the Switch Pak™ with Compact Relay
Controller is to operate a pump or valve between the two set points
(automatic fill or empty).  In this application, a pump or valve can be
wired to either the Normally Open (NO) or Normally Closed (NC)
side of the relay.

AC

AC

GND

NC

C

NO

R

P

Strobe

HOT

NRTL

GND

AC

AC

GND

NC

C

NO

AC

AC

GND

NC

C

NO

HOT

NRTL

GND

AC

AC

GND

NC

C

NO

Relay 

Terminals

Strobe Alert Output

With the Strobe Alert wired NO, the strobe will flash when the Red
LED is ON (Invert OFF).  The strobe will flash when the Red LED is
OFF when wired NC or by turning the Invert ON.  If the strobe is
wired NC and the Invert is ON, the strobe will flash when the Red
LED is ON (same as NO wiring and Invert OFF).

AC

AC

GND

GND

NC

NC

C

NO

NO

R

R

P

Alarm

AC

AC

GND

GND

NC

NC

C

NO

NO

R

R

P

Alarm

NO Wiring

NC Wiring

Power to
Switch Pak
not shown.

Power to
Switch Pak
not shown.

Power to
Switch Pak
not shown.

WIRING

Step Eight

MAINTENANCE

General:

The Switch Pak™ with Compact Relay Controller

requires no periodic maintenance except cleaning as required.  It is the
responsibility of the user to determine the appropriate maintenance
schedule, based on the specific characteristics of the application liquids.

Cleaning Procedure:

1. Power:

Make Sure that all power to the sensor, controller and/or

power supply is completely disconnected.

2. Sensor Removal:

Make sure that the tank is in a state where it

is safe to remove the sensors.  Carefully, remove the Switch Pak™
from the installation.

3. Cleaning the Sensor:

Use a soft bristle brush and mild deter-

gent, carefully wash the Switch Pak™.  Do not use harsh abra-
sives such as steel wool or sandpaper, which might damage the
surface sensor.  Do not use incompatible solvents which may
damage the sensor's PP or Ryton plastic body.

4. Sensor Installation:

Follow the appropriate steps of installa-

tion as outlined in the installation section of this manual.

Controller Logic:  

1. Power LED: 

Make sure the Green power LED is On when

power is supplied to the controller.

2. Input LED(s): 

The input LED on the controller will be Amber

when the switch is wet and Off when the switch is dry. Note: see
Step 5 regarding reed switches. 
If the LED's are not switching the
input LED, test the level switch.

3. Relays:

When both inputs are wet (Amber LED's On), the relay

will be energized (Red LED On). After that, if one switch
becomes dry, the relay will remain energized. Only when both
switches are dry (both amber LED's Off) will the controller de-
energize the relay. The relay will not energize again until both
switches are wet. See the Relay Latch Logic Chart below for fur-
ther explanation.

Current Test (Ultrasonic and Vibration only):

Used to verify if the sensor is indicating a wet or dry condition.  This
test uses only two wires (Red and Black).  The sensor draws 5 mA
(ultrasonic) or 8 mA (vibration) when it is dry, and 19 mA when wet.
The White and Green wires are not used.

Contact Test (Buoyancy only):

Used to verify if the reed switch is switching between dry (open) and
wet (closed).  Check for continuity across Black and White (open for
dry and closed for wet).  Checking across Black and Red will result
in a closed when dry and open when wet condition.

Red

24 VDC

Power Supply

+

-

Multimeter

(mA)

-

+

Black

White

Black

Multimeter

(Continuity)

-

+

Normally Open

(Dry)

Summary of Contents for Switch Pak A*13 series

Page 1: ...here is evidence of a potentially hazardous material present with product b The product has remained unclaimed at Flowline for longer than 30 days after dutifully requesting disposition of the product THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION ON THE FACE OF THIS WARRANTY This warranty and the obligations and liabilities of Flowline under it are exclusive and instead of and the or...

Page 2: ...0 psi 10 bar AV13 25 psi 1 7 bar Wetted material 42__ PP 52__ PVDF Kynar Process mount _2_3 2 NPT _2_7 1 1 2 G Enclosure rating NEMA 4X IP65 Installed height _21_ 6 5 16 5 cm _22_ 4 9 12 4 cm Encl material _21_ PP UL94VO and polycarbonate _22_ PP UL94VO Conduit entrance Single 1 2 NPT Classification General purpose CE compliance EN 50082 2 immunity EN 55011 emission EN 61010 1 safety Sensor Techno...

Page 3: ...evel Switch P N LU10 1305 LU10 1325 LU10 2305 LU10 2325 LV10 1301 LV10 1351 LV10 5301 LV10 5351 or LZ12 1405 A Specify Ultrasonic AU13 4223 1 x LU10 1305 1 x LM45 1001 1 x LC10 1001 AU13 4227 1 x LU10 1325 1 x LM45 1061 1 x LC10 1051 AU13 5223 1 x LU10 2305 1 x LM45 5001 1 x LC10 1001 AU13 5227 1 x LU10 2325 1 x LM45 5061 1 x LC10 1051 Buoyancy AV13 4223 1 x LV10 1301 1 x LM45 1001 1 x LC10 1001 A...

Page 4: ...al wiring of any liquid level control system should be performed in accordance with all applic able national state and local codes Take care not to cut or break the outer insulation jacket of wiring that may be immersed while routing cables in the Switch Pak system Such breaks of the liq uid seal of the sensor system may lead to component failure Flammable Explosive and Hazardous Applications The ...

Page 5: ...overed in the Installation section of the LC10 11 Series Manual Polarity neu tral and hot does not matter 4 Relay terminals NC C NO Connect the device you wish to control pump alarm etc to these terminals supply to the COM terminal and the device to the NO or NC terminal as required The switched device should be a noninductive load of not more than 10 amps for reactive loads the current must be de...

Page 6: ... is completely disconnected 2 Sensor Removal Make sure that the tank is in a state where it is safe to remove the sensors Carefully remove the Switch Pak from the installation 3 Cleaning the Sensor Use a soft bristle brush and mild deter gent carefully wash the Switch Pak Do not use harsh abra sives such as steel wool or sandpaper which might damage the surface sensor Do not use incompatible solve...

Reviews: