background image

© 2007 Flowmaster, Inc.

8)

 

Once the connector pipes are cut to proper length, raise them into position and connect them to the H-
Pipe and header collectors or manifold down pipes using a standard header flange, Flowmaster venturi 
cone, or Flowmaster Ball Flange kit.

 

 

9)

 

Make any final adjustment to the position of the mufflers and pipes. Allow a minimum of  

¾”

clearance 

around all parts. Then tighten down all clamps securely and install the 

7/16” push-on hanger keepers

 

on the round stock sticking through the rubber muffler hangers.  Be sure to allow adequate clearance for 
full suspension travel and vibration. 

 
 

  

 NOTE: WE HIGHLY RECOMMEND WELDING ALL SLIP-FIT CONNECTIONS.

 

 

Packing List 

 

Qty.

                      

Part # or Size 

Part

 

 

    

 BOX 1 OF 2   (5034)

 

 

   953046  

 

Muffler 

 

    

 BOX 2 OF 2   (1038)

 

1                         26172      

 

Connector Pipe, (L) 

1                         26173      

 

Connector Pipe, (R) 

1                         26168 

 

H- Pipe Assembly 

1                         26170 

 

Left tailpipe 

1                         26171  

 

Right tailpipe 

1                         PK419 

 

            Parts kit 

1               

 

287HA  

 

 Clamp Hanger Muffler (R) 

1                

 

288HA  

 

 Clamp Hanger Muffler (L) 

1                

 

308HA  

 

 Muffler Hanger Mount (L) 

1                

 

309HA  

 

 Muffler Hanger Mount (R)    

1             

 

310HA  

 

 Tailpipe Hanger Mount (L) 

1                

 

311HA  

 

 Tailpipe Hanger Mount (R) 

  244HA 

   

Hanger 

Mounting 

Plate 

4               

 

HA168  

 

 Rubber Hanger 

8                

 

HW502 

 

 7/16” Hanger Keepers 

4                

 

MC300R  

 

 3” Ring Clamps 

3                

 

HW208  

 

 3/8”x 1” Bolt 

5                

 

HW303                        3/8” Flat Washer 

  HW309   

3/8” 

Lock 

Washer 

  HW103   

3/8” 

Nuts

 

Reviews: