DURCO MARK 3 ISO FRAME MOUNTED ENGLISH 85392719 06-12
Page 11 of 52
flowserve.com
2
TRANSPORT AND STORAGE
2.1 Consignment receipt and unpacking
Immediately after receipt of the equipment it must be
checked against the delivery/shipping documents for
its completeness and that there has been no damage
in transportation. Any shortage and/or damage must
be reported immediately to Flowserve and must be
received in writing within one month of receipt of the
equipment. Later claims cannot be accepted.
Check any crate, boxes or wrappings for any
accessories or spare parts that may be packed
separately with the equipment or attached to side
walls of the box or equipment.
Each product has a unique serial number. Check
that this number corresponds with that advised and
always quote this number in correspondence as well
as when ordering spare parts or further accessories.
2.2 Handling
Boxes, crates, pallets or cartons may be unloaded
using fork lift vehicles or slings dependent on their
size and construction.
2.3 Lifting
A crane must be used for all pump sets or
components in excess of 25 kg (55 lb.). Fully trained
personnel must carry out lifting, in accordance with
local regulations.
Slings, ropes and other lifting gear should be
positioned where they cannot slip and where a
balanced lift is obtained. The angle between sling or
ropes used for lifting must not exceed 60°.
2.3.1
Bare pump
The bare pump should be lifted as shown:
2.3.2
Pump and folded steel or polycrete
baseplate set
Where the baseplate is folded steel or polycrete there
are no specific lifting points provided for the complete
machine set. Any lifting points that can be seen are
provided only for dismantling parts for servicing.
The pump and folded steel, or polycrete, baseplate set
should be lifted as shown. With a sling around the
pump discharge nozzle, and around the outboard end
of the motor frame using choker hitches pulled tight.
The sling should be positioned so the weight is not
carried through the motor fan housing. Make sure the
completion of the choker hitch on the discharge nozzle
is toward the coupling end of the pump.
2.3.3
Pump and cast iron or fabricated,
baseplate set
The pump and cast iron, or fabricated, baseplate set
which has specific lifting points, should be lifted as
shown:
Before lifting the driver alone, refer to the
manufacturer’s instructions.
Summary of Contents for Durco Mark 3
Page 49: ...DURCO MARK 3 ISO FRAME MOUNTED ENGLISH 85392719 06 12 Page 49 of 52 flowserve com Notes ...
Page 50: ...DURCO MARK 3 ISO FRAME MOUNTED ENGLISH 85392719 06 12 Page 50 of 52 flowserve com Notes ...
Page 51: ...DURCO MARK 3 ISO FRAME MOUNTED ENGLISH 85392719 06 12 Page 51 of 52 flowserve com Notes ...