FP USER INSTRUCTIONS ENGLISH 71576286 - 07/06
Page 22 of 35
It is the plant operator's responsibility to
ensure that all maintenance, inspection and
assembly work is carried out by authorized and
qualified personnel who have adequately
familiarized themselves with the subject matter by
studying this manual in detail (see also section
1.6.2).
Any work on the machine must be performed when it
is at a standstill. It is imperative that the procedure
for shutting down the machine is followed, as
described in section 5.6.
On completion of work all guards and safety devices
must be re-installed and made operative again.
Before restarting the machine, the relevant
instructions listed in section 5,
Commissioning, start
up, operation and shut down
must be observed.
Oil and grease leaks may make the ground
slippery. Machine maintenance must always
begin and finish by cleaning the ground and the
exterior of the machine.
If platforms, stairs and guardrails are required for
maintenance, they must be placed for easy access
to areas where maintenance and inspection are to
be carried out. The positioning of these accessories
must not limit access or hinder the lifting of the part
to be serviced.
When air or compressed inert gas is used in
the maintenance process, the operator and anyone
in the vicinity must be careful and have the
appropriate protection. DO NOT SPRAY air or
compressed inert gas on skin. DO NOT DIRECT an
air or gas jet towards other people. Never use air or
compressed inert gas to clean clothes.
Before working on the pump, take measures to
prevent an uncontrolled start. Put a warning board
on the starting device with the words:
"Machine under repair: do not start"
.
With electric drive equipment, lock the main switch
open and withdraw any fuses. Put a warning board
on the fuse box or main switch with the words:
"Machine under repair: do not connect"
.
Never clean equipment with inflammable solvents or
carbon tetrachloride. Protect yourself against toxic
fumes when using cleaning agents.
6.2 Maintenance schedule
It is recommended that a maintenance plan
and schedule is adopted, in line with these User
Instructions. It should include the following:
a) The pump must be completely vented and
drained and rendered inert before any
disassembly operation.
b) Any auxiliary systems installed must be
monitored, if necessary, to ensure they function
correctly.
c)
During cleaning of the pump ensure the
compatibility between the cleaning products and
the gaskets.
d) Verify the condition of the gaskets.
e) Gland packings must be adjusted correctly to
give visible leakage and concentric alignment of
the gland follower to prevent excessive
temperature of the packing or follower.
Mechanical seals should present no leakage.
f)
Check for any leaks from gaskets and seals.
The correct functioning of the shaft seal must be
checked regularly.
g) Check bearing lubricant level, and if the hours
run show a lubricant change is required.
h) Check that the duty condition is in the safe
operating range for the pump.
i)
Check vibration, noise level and surface
temperature at the bearings to confirm
satisfactory operation.
j)
Check the tightness of the connections.
k)
Check dirt and dust is removed from areas
around close clearances, bearing housings and
motors.
l)
Check coupling alignment and re-align if
necessary.
m) Verify the correct operation of the system.
The equipment used for maintenance and
disassembly in an ATEX zone must be in conformity
with the requirements zone.
Our specialist service personnel can help with
preventative maintenance records and provide
condition monitoring for temperature and vibration to
identify the onset of potential problems.
If any problems are found the following sequence of
actions should take place:
a) Refer to section 7,
Faults; causes and remedies
,
for fault diagnosis.
b) Ensure equipment complies with the
recommendations in this manual.
c)
Contact Flowserve if the problem persists.
6.2.1 Standard maintenance
Roller bearing
The bearings fitted are prepacked with grease at the
factory. When the regreasing period is reached it is
necessary to remove as much of the old grease as
possible with a clean lint free cloth and repack the
bearings with fresh grease.