FP USER INSTRUCTIONS ENGLISH 71576286 - 07/06
Page 3 of 35
INDEX
PAGE
Additional sources (10.3)....................................... 34
Alignment of shafting (see 4.2, 4.4 and 4.7)
ATEX marking (1.6.4.2) ........................................... 7
CE marking and approvals (1.2).............................. 4
Certification (9) ...................................................... 34
Change notes (10.2) .............................................. 34
Cleaning prior to operation (5.8.1) ........................21
Commissioning, start-up, operation (5) ................. 17
Compliance, ATEX (1.6.4.1).................................... 6
Configurations (3.1) ............................................... 11
Copyright (1.4) ......................................................... 4
Direction of rotation (5.1) ....................................... 17
Disassembly (6.5) .................................................. 25
Discharge piping (4.5.3) ....................................... 16
Disclaimer (1.3)........................................................ 4
Dismantling (see 6.5, Disassembly) ...................... 25
Drawings (8.1) ....................................................... 27
Duty conditions (1.5)................................................ 4
Electrical connections (4.6) ................................... 16
End of product life (2.5) ......................................... 11
Faults; causes and remedies (7) ........................... 26
Final checks (4.5.4) .............................................. 16
First pump start up (5.4.2) .................................... 18
Foundation (4.2) ....................................................13
Forces and moments (see 4.5.1)........................... 15
General arrangement drawing (8.3) ...................... 34
Gland packing (6.2.5) ............................................23
Grouting (4.3)......................................................... 14
Guarding (5.2)........................................................17
Handling (2.2) ........................................................10
Hydraulic, mechanical and electrical duty (5.7) ..... 21
Inspection (6.2.2 and 6.2.3)................................... 23
Installation (4) ........................................................13
Internal coating (6.2.6)........................................... 24
Lifting (2.3)............................................................. 11
Location (4.1)......................................................... 13
Maintenance (6)..................................................... 21
Maintenance schedule (6.2) .................................. 22
Mechanical seal (6.2.4) ......................................... 23
Nomenclature (3.2)................................................12
Nameplate (1.7.1) .................................................... 8
Operating limits (see 3.1) ...................................... 12
Ordering spare parts (6.3.1) .................................. 24
Parts lists (8.2)....................................................... 32
Piping (4.5) ............................................................ 15
Protection systems (4.8)........................................17
Pump masses (2.2.2) ............................................10
Receipt and unpacking (2.1).................................. 10
Recommended fill quantities (see 6.2.1) ............... 23
Recommended grease lubricants (see 6.2.1) ....... 23
Recommended spares (6.4) .................................. 25
Recycling (2.5)....................................................... 11
Replacement parts (see 6.3 and 6.4) ....................24
Running the pump (5.5) ......................................... 19
Safety action (1.6.3)................................................. 5
PAGE
Safety markings (1.6.1)............................................5
Safety, protection systems (see 1.6 and 4.8)
Sectional drawings (8.1) ........................................27
Sound level (see 1.9, Noise level) ...........................9
Sources, additional information (10.3) ................... 34
Spare parts (6.3) .................................................... 24
Specific machine performance (1.8) ........................8
Standard maintenance (6.2.1) .............................. 22
Starting the pump (5.4) .......................................... 18
Stop/start frequency (5.5.6) ................................... 20
Stopping and shutdown (5.6) ................................. 20
Storage, pump (2.4) ............................................... 11
Storage, spare parts (6.3.2) ................................... 25
Suction piping (4.5.2) ............................................16
Supplementary manuals or information sources ... 34
Thermal expansion (4.4.1) .................................... 14
Transport and storage (2) ..................................... 10
Trouble-shooting (see 7)........................................26
Vibration (5.5.5) ..................................................... 20
Warning labels (1.7.2)..............................................8