IJ PUMP OPERATION AND MAINTENANCE MANUAL
6-33
BO2660-01
1. Adjust carriage puller screws to allow head (85) to be pushed fully on carriage dowels. Using
hoist, lift head and push it onto dowels, bottoming it against carriage frame. If desired, leave
hoist connected to head.
2. Align puller screws with jackscrew holes in case (37). Height is adjusted by means of
adjusting jacks at each wheel.
3. While maintaining alignment of puller screws with jackscrew holes, butt carriage dowels
solidly against case studs and secure carriage in this position, using for example, a block and
tackle or chain fall.
4. Push head (85) onto case studs and into place on end of case (37) by making even turns on
the carriage puller screws.
5. Remove carriage and loosely install case nuts.
6. Evenly tighten every other case nut pulling head against case. For torque requirements, see
OPERATING SPECIFICATIONS.
7. Install any piping that has been removed, (see ASSEMBLY and PIPING drawings in the back
of this manual).
8. Install any electrical conduits and connect any wiring that have been removed or
disconnected.
6.6.2.3 Installing Head Without Using Carriage
To install the head on the case when no carriage is available, proceed as follows:
1. Install lifting-eye in head, make sure head gasket is installed on head, lift head, and move it
into place on case studs. Push head onto studs as far as possible. Remove lifting-eye and
lifting equipment.
2. Complete steps 6 through 8 under INSTALLING HEAD USING CARRIAGE above.
6.6.3 ROTOR ALIGNMENT
Following installation of a new journal, a new bearing housing, or an internal assembly, rotor
centering in accordance with the following procedure is necessary. After each installation of the
internal assembly and head, the rotor must be aligned axially as described below.
6.6.3.1 Rotor Radial Alignment
This procedure requires temporary assembly of the following bearing parts.
1. Ensure that the seal housings are not installed.
2. If the sensor disk is located inboard of the thrust bearing, install the sensor disk key (1292)
and disk (282) on the shaft.
3. Install the bottom half of each bearing housing (13 and 62).
4. Oil bottom halves of journal bearings (51 and 63) and roll them into their housings.
5. Install dial indicator on each end of the shaft so that one reads bore for outboard seal housing
and the other reads bore for the inboard seal housing. Rotate shaft and take readings at
bottom, top, and each side. Readings thus obtained must correspond to those given in
OPERATING SPECIFICATIONS. If necessary, reposition bearing housings as follows:
a. Attach dial indicators to pump case to read bearing housing position in both directions.
Summary of Contents for IJ
Page 2: ...IJ PUMP INSTALLATION OPERATION MAINTENANCE ...
Page 3: ......
Page 5: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 iv ...
Page 11: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 x ...
Page 13: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 xii ...
Page 17: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 xvi ...
Page 25: ......
Page 35: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 2 10 Figure 2 1 Foundation Bolt ...
Page 65: ......
Page 79: ......
Page 83: ......