IJ PUMP OPERATION AND MAINTENANCE MANUAL
2-5
BO2660-01
CAUTION
Lifting shaft by a single strap around its middle or only one
end will cause bending of shaft.
1. Remove sides and ends of box; shaft must clear box without binding.
2. Remove fastenings that hold shaft to box, then remove plastic cover.
3. Place nylon straps around shaft at points indicated by factory- installed markers. If no
markers are present, measure 25 percent of total shaft length from each end of shaft and place
nylon straps around shaft at these points.
NOTE
The shaft should be stored on wood in an indoor
environment where the temperature does not fall below 60°F
(16°C), completely away from sunlight, and at least 4 inches
(100 millimeters) above floor.
4. Use spreader bar to hold straps in place, attach hoist to center of bar, lift shaft, and place it:
a. on wood supports of equal height that are not more than 24 inches (600 millimeters) apart
and no further than 18 inches (425 millimeters) from shaft end, or
b. in vertical position which is within 10 degrees of the perpendicular to the horizon.
2.2 STORAGE
This section provides storage data for pumps and manufactured by Flowserve. Storage data for
drivers and other auxiliary equipment may be found in the Appendix of this manual.
Summary of Contents for IJ
Page 2: ...IJ PUMP INSTALLATION OPERATION MAINTENANCE ...
Page 3: ......
Page 5: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 iv ...
Page 11: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 x ...
Page 13: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 xii ...
Page 17: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 xvi ...
Page 25: ......
Page 35: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 2 10 Figure 2 1 Foundation Bolt ...
Page 65: ......
Page 79: ......
Page 83: ......