IJ PUMP OPERATION AND MAINTENANCE MANUAL
3-7
BO2660-01
Figure 3-6 Leveling Driver End Lengthwise
Figure 3-7 Leveling Pump End Lengthwise
3). Tighten foundation anchor bolts, and pump feet holddown bolts. As you tighten
bolts, position level as illustrated in the four leveling figures and check leveling in
both crosswise and lengthwise directions. If tightening bolts disturbs leveling, add or
remove shims or adjust leveling screws until baseplate is level in both directions at
places where leveling was disturbed. Again tighten bolts and verify leveling in both
directions. Continue this procedure until all bolts are tight and the baseplate is level;
both lengthwise and crosswise.
Summary of Contents for IJ
Page 2: ...IJ PUMP INSTALLATION OPERATION MAINTENANCE ...
Page 3: ......
Page 5: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 iv ...
Page 11: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 x ...
Page 13: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 xii ...
Page 17: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 xvi ...
Page 25: ......
Page 35: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 2 10 Figure 2 1 Foundation Bolt ...
Page 65: ......
Page 79: ......
Page 83: ......