IJ PUMP OPERATION AND MAINTENANCE MANUAL
4-3
BO2660-01
NOTE
To identify an individual valve that is normally closed
during lube oil system operation, see the LUBE OIL
SCHEMATIC in the back of this manual. Any valve that is
not shown in the schematic as normally closed is normally
open.
6. Position hand-operated lube oil system valves as follows:
a. Open all isolation valves in discharge piping, return piping, and instrument lines and all
vent valves in the filter and heat exchanger.
b. Close all valves in the bypass piping for the back pressure control valve (PCV), heat
exchanger, temperature control valve (TCV), and filter.
c. Close all lube oil instrument panel test valves, and all drain valves on the low level
switch (LSL), reservoir, heat exchanger, and filter.
7. Start auxiliary or spare lube oil pump and operate it until the system is filled with lube oil and
all air is expelled from the system.
8. Close vent valves in the filter and heat exchanger.
9. Shut down auxiliary or spare lube oil pump and check level of lube oil reservoir.
4.1.2.5 Checking and Replenishing Lube Oil Reservoir
Observe lube oil reservoir level glass (LG): level of lube oil should appear between minimum and
maximum level marks on the glass. If there are no marks, then lube oil level should appear higher
than 1/2 but less than 2/3 of the length of the glass. To replenish reservoir, fill reservoir with lube oil
that is specified in OPERATING SPECIFICATIONS until lube oil level in level glass rises to
maximum mark on glass. If there is no mark, lube oil level should rise higher than 1/2 but no more
than 2/3 of the length of the glass. Reinstall reservoir cover.
If lube oil system is equipped with an accumulator (see LUBE OIL SCHEMATIC in the back of this
manual), make certain that lube oil pressure is zero, then check its pre-charge: gauge should read the
pressure specified in APPENDIX or LUBE OIL SCHEMATIC drawing. To service accumulator, see
manufacturer's instructions in APPENDIX.
4.1.2.6 Inspecting Components
If step 1d has not been complied with, immediately before warm-up inspect components such as
gauges, indicators, filters, temperature and vibration detectors, piping plugs and caps, piping, heat
exchangers, lube oil system instrument panel, terminal boxes and housings, switches, auxiliary or
spare lube oil pump motor, lube oil pumps, and valves for cleanliness, damage, installation, and
security.
4.1.2.7 Inspecting Pump, Driver, and Piping
Immediately before warm-up, inspect pump, driver, gear (if applicable), and their associate piping for
cleanliness, evidence of leakage, damage, installation, and security.
4.1.2.8 Warming Up Pump
When temperature of the pumped fluid is above 250°F (121°C), warm up pump before starting; as
follows:
Summary of Contents for IJ
Page 2: ...IJ PUMP INSTALLATION OPERATION MAINTENANCE ...
Page 3: ......
Page 5: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 iv ...
Page 11: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 x ...
Page 13: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 xii ...
Page 17: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 xvi ...
Page 25: ......
Page 35: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 2 10 Figure 2 1 Foundation Bolt ...
Page 65: ......
Page 79: ......
Page 83: ......