IJ PUMP OPERATION AND MAINTENANCE MANUAL
vii
BO2660-01
TABLE OF CONTENTS
(CONTINUED)
3.5.2 SEAL PIPING ..................................................................................................................3-29
3.5.2.1 Carbon Steel Piping...................................................................................................3-29
3.5.2.2 Stainless Steel Piping ................................................................................................3-29
4. OPERATION, MAINTENANCE, AND INSPECTION ............................................................4-1
4.1 STARTUP .................................................................................................................................4-1
4.1.1 READYING AND SERVICING DRIVER .......................................................................4-1
4.1.2 READYING AND SERVICING PUMP AND AUXILIARY SYSTEMS........................4-1
4.1.2.1 Initial Steps in Preparing Brand-New or Factory-Overhauled Pump and Auxiliary
Systems for Operation .............................................................................................................4-1
4.1.2.2 Initial Steps in Preparing for Operation of Old Pump That Has Been off-line for
Extended Period ......................................................................................................................4-2
4.1.2.3 Following Fabrication and Rework of Piping .............................................................4-2
4.1.2.4 Servicing Empty Lube Oil System ..............................................................................4-2
4.1.2.5 Checking and Replenishing Lube Oil Reservoir .........................................................4-3
4.1.2.6 Inspecting Components ...............................................................................................4-3
4.1.2.7 Inspecting Pump, Driver, and Piping ..........................................................................4-3
4.1.2.8 Warming Up Pump......................................................................................................4-3
4.1.3 STARTING PUMP ............................................................................................................4-5
4.2 OPERATION ............................................................................................................................4-7
4.2.1 CHECKS AND MINOR ADJUSTMENTS .......................................................................4-7
4.2.2 ADJUSTING PACKING LEAKAGE RATE ....................................................................4-9
4.2.3 OPERATING AT REDUCED CAPACITY ......................................................................4-9
4.3 STOPPING ..............................................................................................................................4-10
4.3.1 FROM ON-LINE OPERATION TO COLD SHUTDOWN ............................................4-10
4.3.2 FROM ON-LINE OPERATION TO HOT STANDBY...................................................4-11
4.4 MAINTENANCE AND INSPECTION TIPS.........................................................................4-12
4.4.1 PERIODIC SEAL REPLACEMENT...............................................................................4-12
4.4.2 BEARING HOUSING GASKET MATERIAL AND THICKNESS ..............................4-12
4.4.3 LUBE OIL CHANGE RECOMMENDATIONS.............................................................4-12
4.4.4 ACID OR CAUSTIC WASH...........................................................................................4-12
5. TROUBLESHOOTING................................................................................................................5-1
5.1 TROUBLES AND THEIR ORIGINS .......................................................................................5-1
5.1.1 FIRST LISTING ................................................................................................................5-1
5.1.2 SECOND LISTING ...........................................................................................................5-3
6. REPLACEMENT AND REPAIR ................................................................................................6-1
6.1 GENERAL INSTRUCTIONS...................................................................................................6-1
6.1.1 ITEMS AND DETAILS EXCLUDED FROM INSTRUCTIONS ....................................6-1
6.1.2 DISTURBING AN INSTALLATION ...............................................................................6-1
6.1.3 GASKETS REQUIRE CONSIDERATION ......................................................................6-1
6.1.4 WHEN TO REPLACE WORN PARTS ............................................................................6-1
6.1.5 PARTS ORDERING INFORMATION .............................................................................6-1
6.1.6 SETSCREWS.....................................................................................................................6-1
6.1.7 WEAR PARTS...................................................................................................................6-1
Summary of Contents for IJ
Page 2: ...IJ PUMP INSTALLATION OPERATION MAINTENANCE ...
Page 3: ......
Page 5: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 iv ...
Page 11: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 x ...
Page 13: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 xii ...
Page 17: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 xvi ...
Page 25: ......
Page 35: ...IJ PUMP OPERATION AND MAINTENANCE MANUAL BO2660 01 2 10 Figure 2 1 Foundation Bolt ...
Page 65: ......
Page 79: ......
Page 83: ......